Public input sought on Bonner Road corridor evaluation
The Lake County Division of Transportation is seeking public input as it evaluates the Bonner Road corridor between Darrell Road and Fairfield Road and explores opportunities to improve traffic operations and make it easier and safer to walk and bike.
While any construction resulting from the study is not anticipated until after 2031, this is an early opportunity for residents to share concerns, identify problem areas and help inform the study, according to LCDOT. In the meantime, plans are to resurface Bonner Road east of Route 12 in 2027 to address immediate pavement needs.
A virtual forum has been launched to share ideas and ask question through Dec. 14. An interactive map is available to drop a pin and comment on a specific location.